Economic effect

Advantages of our materials and methods:

  • domestic production;
  • methods require no design work;
  • elimination of sand-blasting and use of toxic coatings, burial of toxic wastes after cleaning of the underwater part of a vessel, metal structure, of penalties and forfeits, etc.;
  • shorten the duration of repair of an object (dock-days);
  • reconditioning of an object is effected 12-18 times as fast as a new construction;
  • mechanical cleaning of local sections is carried out by a soft method precluding decrease of the wall thickness;
  • the "Contrast" rust converter and "Graphplast" antifouling coating are non-toxic and non-flammable;
  • they dry up quickly and can be applied to a moist surface;
  • emergency sets made of "Graphplast" are used in fire-fighting;
  • the "Contrast" rust converter, which is diffusable, blocks corrosion centers in metal cavities;
  • repair by the indicated method costs 5-6 times as little as a new construction;
  • require no expenses for accident prevention and environmental protection;
  • labor input is greatly reduced;
  • guarantees for 7.5 to 25 years;
  • use of our coatings provides for strengthening of walls and elimination of defects (cracks, blowholes, etc.); waterproofing and reduction of leakages; increase of the throughput capacity of pipelines and of the sliding of ships because of hydrophobicity of coating and low friction coefficient (Kfr = 0.11-0.06); reduction of energy losses by 15-20% through reduction of friction; preservation of quality of potable and high-quality process water, etc.

We offer for consideration and determination of the economic effect an alternative scheme of painting of a floating crane with a hoisting capacity of 1,200 tons:

Surface  Area,
m2
Design agencies
(coatings of foreign firms)
"Ruslan&Lyudmila"
Version 1
"Contrast" rust converter + "Graphplast"
"Ruslan&Lyudmila"
Version 2
Price of
1 m2, UAH
Sum,
UAH 
Price of
1 m2,
UAH
  
Sum,
UAH
Price of
1 m2,
 UAH
 Sum,
UAH
System 1: underwater part of hull 5750 39,49 227010 33,79 194292 39,48 227010
System 2: outer walls of hull  2300 21,46 49358 19,42 44666 21,46 49358
System 3: open deck  4450 21,46 95497 19,42 86419 21,46 95497
System 4: outer wall of container control station  120 16,70 2004 10,48 1258 16,70 2004
System 5: hoisting device mechanisms  950 28,71 27274 16,54 15713 28,71 27274
System 6: outer part of hoisting device metal structures   4220 28,71 121156 16,55 69841 28,71 121156
System 6: inner hoisting device   4560 28,71 130918 16,55 75468 28,71 130918
System 7: deck mechanisms and foundations   300 24,42 7326 13,67 4101 24,42 7326
System 8: foundations for containers  100 25,75 2575 16,58 1658 25,75 2575
System 9: supports for installation of bridge span  100 24,42 2442 13,67 1367 2442 2442
System 10: outer surface of supports for installation of bridge span  10 25,75 257 14,90 149 25,75 275
System 11: outer platforms above framework  20 24,42 488 11,78 236 24,42 488
System 12: guard rails  250 20,13 5033 13,78 3445 20,13 5033
System 13: outer ladders 60 20,13 1208 13,88 833 20,13 1208
System 14: surfaces for insulation and without insulation for covering  700 8,97 6289 6,92 4844 6,92 4844
System 15: surfaces on insulation without covering  570 8,58 4891 5,75 3277 5,75 3277
System 16: deck without coating  280 8,97 2512 6,09 1705 8,97 2512
System 17: batten of covering  60 8,97 538 6,02 361 8,97 538
System 18: liquid fuel tanks  11050 25 276250 16,54 182767 16,54 182767
System 19: dry compartment  42850 17,94 768729 13,67 585760 13,67 58760
System 20: floorings  100 13,45 1345 9,27 927 13,45 1345
System 21: foundations  100 13,45 1345 9,27 927 13,45 1345
System 22: pipings 300 12,87 3861 9,27 2779 12,87 3861
System 23: fuel reserve tank  16 25 400 18,47 296 25 400
System 24: overflow tak  12 25 300 19,83 238 25 300
Total, thousand UAH        1739,0 1283,3   1459,5
Difference (+,-), thousand UAH 



-455,7   -279,5


The economic effect on this object amounts to UAH 455,7 thousand or US$ 91,1 thousand.

 At a partial use of our materials on surfaces of dry compartments and surfaces for insulation, the economic effect amounts to UAH 279,5 thousand or US$ 55,9 thousand.

 When above-indicated advantages of our materials are taken into account, the economic effect rises by 40 to 60%. Moreover, our firm admits discounts for introduction of technologies.

 Having received your technical task order and requirements for materials, we will develop the scheme of cleaning and painting of the surface of objects and will be willing to render services on cleaning and coating of surfaces and on delivery of materials, and also to conclude agreements for introduction of technologies and long-term cooperation.